Variation & Claim Auditor

Finds the claim that will fail on notice, while you can still send one

Version 2Published Sep 2, 2026
ConstructionKnowledgeExtractclaude-opus-5Read-only · auto8 hard rules5 handover rulesResult
8hard rules
Things it must never do, enforced in every run
5handover rules
Conditions where it stops and gives the work to a person
8output fields
A structured result, not a paragraph you have to re-read
≤6steps per run
Bounded work: at most 5 tool calls, enforced by the runtime

Read-only by design. This agent has no path to sending, spending, publishing or committing anything. Where that limit is the product, removing it would remove the reason to trust the output.

Live wiring for version 2. Tool nodes are the capabilities this agent is registered to call — nothing else can run.

Overview

Contractors rarely lose money on pricing. They lose it on notice: work was instructed, everyone on site knew it, and the claim fails eighteen months later because the contract required written notice within fourteen days and nobody sent one.

This agent reads the contract in your knowledge base for what actually creates entitlement — the clause, the notice period, the form the notice must take, the records that must accompany it — and checks each variation and claim against it. It reports which are within time, which are approaching a deadline, and which have already lost their entitlement on notice, quoting the clause.

It also finds the instruction that was never treated as a variation at all: a site instruction or a drawing revision that changed the work and was never captured. That one is invisible until the account is settled. It does not price claims, does not tell you whether one will succeed, and does not draft correspondence that admits or concedes anything.

Benefits

Entitlement kept

The deadline caught while a notice can still be sent.

Nothing missed at settlement

Variations captured while the record is fresh.

A defensible file

Findings tied to clauses and dates.

What it does

  • Notice periods, tracked against the clause

    Which claims are in time, which are close, and which have already lost entitlement.

  • Finds uncaptured variations

    The site instruction or drawing revision that changed the work and was never raised as one.

  • Checks the form of notice

    Many contracts require a specific form and recipient. A correct notice sent wrongly is not notice.

  • Names the records required

    What the contract says must accompany a claim, and which of it you have.

  • Quotes the clause

    Every finding traceable to the contract, so a commercial manager can check it.

  • Prices nothing

    Valuation and strategy are a quantity surveyor's work.

What this changes

What this changes about your week

It takes over
Checking variations against the contract's notice periods while entitlement still exists.
Done today by
A commercial manager, between site visits.
How often
Monthly, and every instruction.
Typical manual effort
Reading the amended contract against the variation register is a day a month.

Why Construction in particular. Contractors lose money on notice, not on pricing. Work everyone saw instructed fails eighteen months later over a notice nobody sent.

  • Runs unattended

    Started by you or by an event, and it finishes on its own. Nothing waits for someone to be at a desk.

  • The same standard every time

    The two-hundredth item is held to the bar the first one was. Consistency is the part people cannot sustain.

  • It cannot act on its own

    Variation & Claim Auditor has no path to sending, spending or committing. That limit is why its output is safe to act on.

How it runs

This agent runs server-side through the PROMIVO runtime. Each run is logged step by step and every tool call is permission-checked before it executes.

  1. 1InputValidated against the agent input schema
  2. 2Modelclaude-opus-5 with automatic fallback
  3. 3Toolssearch_knowledge, extract_structured_data
  4. 4PermissionsRuns READ actions automatically; anything higher waits for approval
  5. 5OutputStructured result matching the output schema
  6. 6LoggingTokens, duration and every step recorded

Demo

Demo dataIllustrative sample output, abridged.

Input

{
  "project": "Depot extension",
  "asAtDate": "2026-09-02",
  "variations": []
}

Output

{
  "claims": [
    {
      "status": "out-of-time",
      "reference": "VO-114",
      "formCorrect": "unknown",
      "clockStarted": "2026-08-19",
      "noticePeriod": "7 days",
      "missingRecords": [
        "Daily allocation sheets for the affected period"
      ],
      "sourceDocument": "Schedule of amendments 2025 — item 12",
      "entitlementClause": "Clause 61.3 as amended — notice within 7 days of becoming aware, not the standard 8 weeks."
    }
  ],
  "escalate": true,
  "disclaimer": "A check against the contract as retrieved. Not legal advice, not a valuation, and not an assessment of whether any claim will succeed.",
  "contractFound": true,
  "contractDocument": "Main contract, as amended — schedule of amendments 2025",
  "escalationReason": "VO-114 appears out of time under an amended 7-day notice period, and a drawing revision was never raised as a variation.",
  "uncapturedVariations": [
    "Drawing revision C issued 2026-08-27 changed the slab detail. No variation raised in the record supplied."
  ]
}

Requirements

Integrations

No integrations required.

Before you start

  • A knowledge base holding the contract and its amendments
  • Variations, instructions and the site record
  • Requires the All-Access plan or higher

Use cases

Monthly commercial review

Every open variation checked against its notice clause.

A new instruction

What the contract requires, and by when.

Preparing final account

Find what was never captured as a variation.

Pricing

All-Access

Billed monthly through your PROMIVO subscription. Cancel at any time.

Runs consume your plan allowance for agent executions and tokens. See plan limits

FAQ

Does it value claims?

No. Valuation is a quantity surveyor's work and depends on records and rates outside this. It checks entitlement and process, which is where entitlement is usually lost.

Will it say whether a claim succeeds?

No. It reports whether the contract's requirements appear to have been met and where they have not. Success depends on facts, evidence and often a lawyer.

What if the contract is not loaded?

It stops and says so. Notice periods differ under every standard form and every amended contract, and assuming one would be worse than checking nothing.

Reviews

Reviews open once customers have run this agent.

Need this agent to work differently?

Tell us what to change and our team will scope a customised version for your business.

Customize this agent